National Cost Estimator & Project Scheduler - (Remote)
Stockton, CA 
Share
Posted 14 days ago
Job Description
Job Details
Level
Experienced
 
Description

General Description: Arora Engineers, LLC. provides design and construction services for MEP, fire protection and alarms, and low voltage/special systems for aviation, transportation, educational, and commercial and institutional facilities.

Overall Responsibility: involved in projects with our Planning and Design Team and be a part of a growing organization that meets our client's objectives and solves their challenges. The ideal candidate will have a technical background in construction, remediation, renovations, and/or facility management

Essential Functions:

  • Responsible for assessing, adjusting or creating an estimation template.
  • This role will be responsible for creating detailed, market-related owner's cost estimates for assigned projects' scope changes, work delays, etc.
  • Responsible for reviewing change requests and determining material requirements, processing, and job routing.
  • This role will coordination meetings with clients or other stakeholders.
  • Responsible for leading client and contractor negotiations to resolve contract changes and claims.
  • Responsible for developing construction cost estimates and prepare an estimate reference as required by the Estimating Lead, in accordance with the program requirements.
  • Responsible for ensuring all estimates are accurate and account for all risk factors.
  • Responsible for reviewing quantitative surveys for all types of construction systems and materials.
  • Responsible for seeking additional useful estimating data from various sources.
  • Responsible for partaking in design/specifications reviews for cost-effectiveness and suggest appropriate alternatives.
  • Responsible for mentoring, training, and supporting less experienced estimators.
  • Review construction schedules with supporting documentation to assist the project teams.
  • Assist the Project Team in evaluating and monitoring the Contractors progress schedule as well as consulting and troubleshooting issues throughout the construction of the project.
Qualifications

REQUIRED QUALIFICATIONS:

  • Experience with U.S. Postal Service Facilities Technical Group and various USPS building design criteria
  • 10 - 15 years of relevant experience in Project Estimating and Scheduling.
  • Ability to communicate in English, both written and verbal (professional level required).
  • Previous relevant experience in the engineering and construction industry is considered an asset.
  • Adaptability and flexibility including the ability to manage deadline pressure, ambiguity, and change.
  • Ability to multitask, work on several projects or tasks at once, manage time, organize, and set priorities.
  • Strong interpersonal skills, as the role requires continuous interaction with team members.
  • Strong communication skills, both written and verbal, including report writing, editing, and proofreading abilities.
  • Strong computer skills, including Microsoft Office suite and Outlook; highly advanced Microsoft Excel skills.
  • Strong analytical and quantitative skills are a must.
  • Exceptional interpersonal, analytical, and organizational skills.
  • Knowledge/Experience of ACCE (formally known as K-Base) and/or InEight Estimate (formally known as HardDollars).
  • Have excellent computer skills within depth knowledge of Primavera P6 scheduling software and Microsoft Project.
  • Ability to utilize Microsoft Office products, specifically Word and Excel will be required.
  • Experience with construction schedules for the design-build phase of the projects.
  • Possess an in-depth knowledge of construction practices and sequencing.
  • Critical Path Method (CPM) scheduling knowledge/experience and the ability to analyze schedules to determine duration and logical issues.
  • Experience with time impact analysis.
  • Experience integrating the construction schedule into the master schedule.

Arora Engineers, Inc. is an Affirmative Action and Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, or protected veteran status and will not be discriminated against on the basis of disability.


 

Job Summary
Start Date
As soon as possible
Employment Term and Type
Regular, Full Time
Required Experience
10 to 15 years
Email this Job to Yourself or a Friend
Indicates required fields